Challenger Mine

Every brown-field site re-commissioned is another piece of the environment protected.

  • Completed farm-in with Adelong Gold Ltd (ASX:ADG) to operate the Adelong Venture comprising the Challenger Gold Mine and processing plant. Ownership extends to 51% on ‘first pour’ from the Adelong Mine Process Plant
  • Assets include ML 1435, EL 5728 – 68km2 of exploration permitted and 1.5km2 of mining permitted
  • Plant and equipment maintained, tested, and restarted during due diligence period. Plant is ready to restart with existing ore at surface.
October 2022 Scoping Study Production Target
(from ASX:ADG Announcement 31/10/22 “Updated Scoping Study shows substantial improvement with addition of Caledonian Deposit”)
Production Targets
Tonnes (t)
Grade g/t Au
Contained Gold (oz)
Measured Resources
Indicated Resources
Total Treated
788,320 t
3.47 g/t Au
87,818 oz
43%
40%
Challenger Open Cut
372,397
3.79
45,426
78%
17%
Challenger Underground
74,782
3.59
8,639
60%
40%
Caledonian Open Cut
79,000
5.76
14,630
77%
Currajong Open Cut
262,141
2.27
19,153
69%

Next 2 Years

  • Pour ‘first gold’ in FY25 and advance to 51% equity
  • Develop continuous mining operation at ~15,000 kOz per annum scale
  • Undertake resource expansion drilling, expand mining to suit

Great Divide Mining Ltd

Level 12, 127 Creek Street Brisbane QLD 4000

ABN: 47 655 868 803

Phone Number: 07 3071 9290

Email: admin@greatdividemining.com.au

Get In Touch

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.